Exam session goes easily bad with the cooling technology

It had been 4 years of preparation for these exams.

I was confident that I would ace these exams as from when I was a child, I had dreamt of becoming a doctor plus nothing was going to stop me.

The people I was with and I were all looking forward to going out into the world plus starting jobs of saving lives. The people I was with and I were around 200 students ready to tackle the exams. The exam room could hold about 500 people. It had a big hall with a high ceiling plus giant windows that brought in a lot of light. The people I was with and I had just started the paper when the un-even temperatures started getting cooler, I shot an eye to the head invigilator who had the Wi-Fi control unit, hoping he could increase the un-even temperatures. When everyone started complaining of the cold inside the exam hall, the invigilator seemed to be fidgeting with the controller plus announced that it had malfunctioned plus was not communicating with the zone controlled Heating, Ventilation plus A/C device therefore it was not giving out quality heating to the hall. Though the air duct was easily well done, I noticed a Heating, Ventilation plus A/C duct sticking out appreciate a sore thumb. They switched on the oil heating system plus the portable space heating system in order to make the exam room warmer so we could continue with our paper, but that solution didn’t last long. The exam was canceled plus they called a Heating, Ventilation plus A/C repairman who updated the cooling device plus updated the cooling technology supplied by the cooling plus heating business. The heating supplier also performed a furnace heating system tune-up on the unit. Despite him being a ductless multi-split specialist, he was able to resurrect the plan plus we continued with our paper in the afternoon. Though it was a long day, I was confident that I aced the test.

Cooling install

Leave a Reply

Your email address will not be published. Required fields are marked *